Kaiping OUBAO Sanitary Ware Industry Co.,Ltd|North American Kitchen Faucet|North American Certified
Welcome to the OUBAO official website!
BE CAREFUL
SERVICE
Precautions for installation of water faucet
1. When installing the faucet, try to install the packing bag so as to avoid direct contact with the surface of the faucet with the hand or the tool.
2. Before installing the inlet pipe of the faucet, the sewage in the pipe is cleaned until the cold and hot water pipe is out of the water.
3. The connection of the inlet pipe must comply with the international regulations, and the left heat is right and cold.
4, tighten the screw, not too hard, when the hand tight, the wrench wrench half buckle.

Precautions for installation of sprinkler
1, the surface of the wall should be consistent with the screw interface, so as to avoid the ascent of the shower body and shower rod after installation. No one wants to install his own sprinkler after it is installed.
2. The angle of the screw interface in the cold and hot water outlet of the wall should be consistent, so as to avoid the situation of leakage after the installation and use of the water.
3, inside the wall, the screw interface of the hot and cold water outlet should be neat with the tiles. It should not be too stuck and protruded, so as not to cause uninstallation. If this condition is forced to install, it will be very ugly.
4, must not avoid hollowing tiles, tiles will be cracked after drilling. Whether it is home anywhere can not hollowing tiles.
5, in the wall should be marked with the location of the water and circuit, to avoid breaking the water pipe when drilling.
6, if you want to install a bathtub, then the location of the hot and cold water outlet of the bathtub head should be about 700mm from the ground. If the shower is high, the hot and cold water outlet should be 1000mm from the ground. It's the distance between the ends and the bricks.

Precautions for installation of bathtub
1. when installing the faucet, try to install the packing bag so as to avoid direct contact with the surface of the faucet with the hand or the tool.
2. before installing the inlet pipe of the connecting faucet, the sewage in the pipe is cleaned until the cold and hot water pipe is out of the water.
3. the connection of the inlet pipe must comply with the international regulations, and the left heat is right and cold.
4. tighten the screw, not too hard, and wrench the half button with the wrench when the hand is tightened.
CONTACT US
OUBAO was founded in 2004, is located in the famous "Chinese bathroom plumbing industry base" - Guangdong Province, Kaiping city water town. 
 
NO.78-80 Jiaxing South Road.Shuikou Town, Kaiping City,Guangdong,China
0750-2732977  /  2738068
sales@oubao-cn.com
Copyright © 2018 Kaiping OUBAO Sanitary Ware Industry Co.,Ltd All Rights Reserved 粤ICP备2021072784号 Design:Linkor